View full page at metalsmine.com

 

Kipushi copper-cobalt project engineering study completed

From miningreview.com

Cape Lambert Resources' engineering study for a leaching plant at the Kipushi copper-cobalt tailings project in the DRC was recently completed. Central Africa - The engineering study was undertaken following the excellent results achieved from a leach test work programme at the project, with recoveries of 90% for copper and 85% for cobalt being achieved from laboratory scale test work undertaken to date. The copper-cobalt project is held by Soludo Lambert Mining SAS, which is a 50/50 joint venture arrangement with local entity Paragon Mining SARL and Cape Lambert. The project involves the reprocessing of ... (full story)

Story Stats

  • Posted:
  • Category: Fundamental Analysis