View full page at metalsmine.com

 

Europe’s top zinc mine halted due to water flows

From mining.com

Swedish miner Boliden (STO: BOL) said on Wednesday it had halted production at its Tara mine in Ireland, Europe’s largest zinc mine, due to increased water flows into the operation. Water began flooding the underground mine as a crew was drilling a pilot raisbore hole for a ventilation shaft. Inflow volumes are exceeding the capacity of the dewatering infrastructure, the company said, adding it was unclear for how long production will be stopped. In 2020, the Tara mine produced 127,000 tonnes of zinc concentrate and 14,000 tonnes of lead concentrate. The news boosted zinc prices 2.2% to 3,420 a tonne on the London ... (full story)

Story Stats

  • Posted:
  • Category: Fundamental Analysis